Scope:

Outside cleaning of the tower, rope rigging asssistance, replacements of 7 aviations lights. We completed our work with 3 Wind Turbine Technicians and within 360h timeframe.

14 turbines: Vestas V136/4000-4200 (power 4 000 kW, diameter 136 m)

Total nominal power: 56,000 kW

Frøya wind farm is located in Frøya municipality.

The wind farm area covers 6.6 km2. The license was granted in 2012. The licensed performance is 60 MW installed capacity. Frøya wind power plant was originally applied for a license in 2004 with 200 MW installed capacity, but after license processing has been reduced to 60 MW installed capacity and with an expected annual production of 201.8 GWh. A license was granted in 2012, this was appealed and final permission was granted by the Ministry of Petroleum and Energy in August 2013. The wind farm was started on 1 October 2020 and the park opened to the public on 1 January 2021.